The unique architecture of the Airrail Center, and the fact that the roof of existing building forms the basis for nine new storeys, requires a complex formwork and scaffolding solution. In particular, for the transfer of loads during construction progress, extensive planning and specially-adapted scaffold towers and constructions are required. The unusual project location sandwiched between motorways and federal highways, as well as the very tight schedule, result in extremely difficult logistical challenges. Among other things, PERI has convinced both client and contractor with correspondingly appropriate and efficient planning and logistics services.