Erosion at an advanced stage on Mount Benacantil and the associated risk of falling rocks meant that extensive stabilization measures were required. For this, PERI planned and supplied a scaffold solution complete with working platforms which ...
With the VitraHaus, this unique collection of extraordinary structures located in south-west Germany, received yet another highlight of international architecture – realised through PERI system equipment. The Implenia construction team only ...
For the building of the Edificio Ágora, PERI UP Rosett modular scaffold has once again highlighted its advantages in the best possible way: tremendous flexibility for complex geometrical requirements, high load-bearing capacity and a simple ...
An extremely unusual design, tough architectural concrete requirements and tight space restrictions demanded the close collaboration of everyone involved in the project.
The complicated design of the concrete shell presented many challenges to PERI design engineers particularly due to the varying dimensions of each consecutive slab.