In the course of the expansion of Route Nationale 88, an 80 m long wild game underpass is also being realised. For construction of the arched tunnel, a PERI tunnel formwork carriage on the basis of the VARIOKIT engineering construction kit ...
The 14.40 m diameter, 10.4 km long Niagara Tunnel is one of the largest tunnels ever built in North America. Upon completion, the tunnel will deliver 500 m3 of water per second from upper Niagara River to the Sir Adam Beck power station. Dufferin ...
A combination of PERI’s ST 100 Stacking Towers, the MULTIPROP system and the VARIO GT 24 Girder Wall formwork system were used in the construction of some of the 6 stations and a certain section of the tunnels.
In the city of Bern, a roundabout is currently being re-positioned almost 10 m under the ground which will transform a somewhat dismal road intersection into an attractive gateway to the country´s capital. PERI provided a comprehensive formwork ...
A crosscut providing vehicle access between the existing and new Pfänder Tunnel tubes has been constructed using a tunnel formwork carriage on the basis of the VARIOKIT engineering construction kit. The high proportion of serial components ...