The MaxHaus Morumbi in São Paulo consists of four residential towers each with eight storeys. In addition to PERI climbing formwork with VARIO and CB, GRIDFLEX aluminium grid slab formwork is being used for the first time in Brazil.
In the centre of the Belgian town of Lokeren, an existing building was converted into a residential complex with six loft apartments. In addition to the building conversion, a 12 m high front-positioned elevator and stairway facility was to ...
The cellar of the Rettenberg single-family house was realised on an incline with 25 cm thick reinforced concrete walls and formed in two concreing cycles.
20 % time-savings – the new MAXIMO panel formwork shortened the construction time for the cellar walls by almost one day. The conical MAXIMO tie is fitted from one side only which means having one man on the external wall is no longer necessary. ...