For the 62 m long and 27 m wide discharge facility, two parallel side walls, which rise in the direction of the centre with heights ranging between 3.30 m and 13.50 m, were to be constructed.
The Ford Quality Scheme at Herne Bay involved the construction of a 62m x 35m x 4.70m high underground reservoir, a pumping station and 6km of water pipeline.
The West Side Combined Sewer Overflow Project, when completed will collect wastewater from existing sewers and carry it over 4 miles under the Willamette River.