For the Canadian hospital project with its special requirements regarding slab dimensions, construction time and progress, a PERI special solution has proved to be the most cost-effective option.
|
|
Patina located in downtown Vancouver, British Columbia, is a landmark 43 storey high, 818 m2 per level residence with 256 suites. To meet the 4 day pour cycle requirement of the jobsite, ACS self climbing formwork system was chosen to form ...
|
|
The four-storey office building in the Paris suburb is 100 m long and stands out due to its inclined external facade. While the top floor is constructed in a straight line, and thus parallel to the road, the ground floor has been offset by ...
|
|
For completing the terminal structural work of the new airport in Berlin the engineering specialists from several PERI branch offices planned the efficient formwork and scaffolding solutions in close co-operation with the contractor.
|
|
Louis Boheme is a new 28 story condominium building project in downtown Montreal. To keep the construction site as safe as possible, PERI has supplied a full scope of products.
|