Housing

4<sup>th</sup> Ave. Jail, Phoenix, AZ McCarthy Building Co. was awarded this $91 M (USD) jail project containing 1,360 cells.
OCW office and appartment complex, Frankfurt/Main, Germany PERI provided a cost-effective formwork system comprising a total of seven in-situ slabs with integrated façade panels for this city centre site.
The Museum Towers in Cambridge, MA, USA Construction of three concrete residential towers and a garage was accelerated by careful planning, close coordination of contractors and suppliers, and use of lightweight forming systems.
East Side Village Loft, Calgary, AB, Canada This 8 level residential condominium building required the slab to be poured at a height over 15'' - 8" (4.8 m).
Classico Condominiums, Vancouver, BC, Canada The Classico Condominium project consisted of a 38 story residential structure.
 Page:  6  10