As it was impossible to achieve the required level of concrete finish for the 12 bridge piers using steel-faced shutters and traditionally fabricated formwork panels, the Contractor chose special pre-fabricated formwork systems manufactured ...
Currently, the D 8 motorway on the Czech side and the A 17 German autobahn are being developed to form a very important arterial road, the new E55 European highway between Dresden and Prague.
The superstructure of this 53 m long bridge section consists of a twin-webbed T-beam cross-section with a 12,50 m width, a cross fall of 3.5 % and has been designed with a radius of 225 m.
The efficient PERI formwork solution, based on the ACS self-climbing system ensures a fast construction sequence building 173 m high pylons for this spectacular bridge construction in the leading economical powerhouse in South-East Asia.