Multi-Storey Buildings

Between two Bridges, Abu Dhabi, UAE ALEC/AJES Joint Venture has been employed to manage the Design and Construction of a 5 Star resort hotel complex in Abu Dhabi located in the Between the Bridges area on the channel that separates the mainland from Abu Dhabi Island.
Lochrin Square Development, Edinburgh, United Kingdom This component allows all the inner core formwork to be struck in seconds and moved as a single unit.
Bankside 123 Development, Southwark, London SE1 With building one nearing completion, construction began on the partially joined buildings two and three with the help of PERI’s new Rail Climbing System (RCS).
First Central Development, Park Royal, London W3 What set this project apart from the many other SKYDECK projects this year were the impressive 7.50 m tall MULTIPROP towers used to support the SKYDECK soffit formwork at the east face of the building.
The Bristol Alliance, Bristol PERI equipment used on the 36 acre site included; SKYDECK, VARIO, RUNDFLEX, MULTIPROP, CB 240 (2.40 m walkway) and CB 160 (1.60 m walkway).