Multi-Storey Buildings

Stadtbahnbögen Development, Vienna, Austria The special challenge for Bilfinger Berger was to construct two apartment floors at the dizzy height of eleven metres. In PERI, the contractor found the ideal partner for this task. The loads from the slabs on three floors totalling 90 cm, ...
Hotel Rennweg, Vienna, Austria A cut-and-cover method was used for the basement levels and the TRIO Alu wall formwork ensured fast construction progress here.
IFEMA Exhibition Centre, Madrid, Spain With the new exhibition halls, 12 and 14, the IFEMA trade fair centre in Madrid has been extended by 50.000 m² of covered exhibition space.
Kröpeliner Tor Center, Rostock, Germany For construction of the 36 cm thick strong prestressed concrete slabs, the contractors decided in favour of the SKYDECK drophead.
Capella Hotel Sentosa Island, Singapore Due to the short construction period, general contractors, Tiong Seng, decided to take a new direction in the form of innovative formwork systems from PERI.